"Auntie, what's a credenza?"
"It's like a bureau for an office. It has doors and shelves for storage."
This was part of a conversation I had with my nephew last week. I was describing how the installers got the three six foot long credenzas out of the truck, through the factory, and into the conference room. It was not an easy feat.
Much finagling was done to get this particular credenza out of the truck.
The shortest distance between two points
turned out to be a tour all around the building.
and then getting flipped over onto one side.
There was 1/2" clearance at the top of the door frame to get these into the room.
Then I had to install the computer equipment.
There are still a few little things to do. We need to move the speaker phone to the middle of the big table and purchase a more attractive trash receptacle, get the electricity connected to the table and stock the credenzas with notepads, pencils, coffee mugs, napkins and safety glasses and a whole collection of other stuff.
But, as we say here in New England, we are wicked proud of it.
Page 1
- Home
- Thoughts on Art, Creativity & Inspiration
- Friends
- Good Stories
- Tutorials
- Free Pieced Houses
- Lynne Tyler Word Quilts ~2009 - 2010
- Lynne Tyler Word Quilts ~ 2011
- Lynne Tyler Quilts ~ 2012
- Lynne Tyler Quilts ~ 2013
- Lynne Tyler Quilts ~ 2014
- Lynne Tyler 2015-2016 Quilts
- Lynne Tyler Quilts - 2017
- Lynne Tyler Quilts 2018
- 2019 Quilts
- 2020 Quilts
- 2021 Finished Quilts
- 2022 Quilts
- 2023 Quilts
- My Studio
- 2024 Quilts
- 2025 Quilts
- Doll Swap Quilts
- Details, Details & More Organization Stuff
- Couch, Bed & Table Quilts
- Scrap Slab Triangle Quilts
- Gizzy Quilts
- Slashed Squares Quilts
- Zebras
- Diamond Quilts
- Table Quilts
- Lynne's Bird Quilts
- Flight Of Fancy Hints
- Not Yet Finished...
- Quilts & Their Owners
- Christmas Quilts
Showing posts with label work work work. Show all posts
Showing posts with label work work work. Show all posts
Thursday, August 8, 2013
Wednesday, August 7, 2013
The Room is Finished!
Remember last fall I was project manager for the conference room renovation where I work?
The final elements were installed on Friday. The chairs were unpacked first.
Naturally, they had to be tested.
The 12' long table was brought into the room and asssembled.
It needed five guys to flip it over.
These metal doors cover a trench in which electrical, network, and telephone connections are hidden.
Our company makes the thin brushes that seal the openings and secure the cables and cords.
Yes, I am wearing a shirt with the company's logo. I was so happy, and so utterly exhausted. (Wow. I didn't know my hair was so gray.)
There were still three six-foot long credenzas to be brought into the room. That proved to be a challenge. More on those later!
The final elements were installed on Friday. The chairs were unpacked first.
Naturally, they had to be tested.
The 12' long table was brought into the room and asssembled.
It needed five guys to flip it over.
These metal doors cover a trench in which electrical, network, and telephone connections are hidden.
Our company makes the thin brushes that seal the openings and secure the cables and cords.
There were still three six-foot long credenzas to be brought into the room. That proved to be a challenge. More on those later!
Tuesday, October 2, 2012
The "Jewelry"
At work, those of us involved with the new conference room have been referring to the new computer devices as the room's "jewelry." Here are three of our proudest pieces.
First, this 60" flat screen tv/monitor.
Next, this almost eight foot wide interactive whiteboard. We'll be able to draw on this whiteboard and save our work to a computer.
Last but not least is the ceiling mounted projector (it's the black box in the upper right hand corner) capable of projecting an 10 foot wide image onto the wall opposite. Nobody will ever be able to say they can't read the numbers on a presentation ever again.
I am very proud to be a part of the renovations but I have to tell you it is wearing me out. I got home very late last night, and by the time I had eaten my dinner it was 9 PM. I've been spending my downtime sacked out on the couch with a few good books, notably the Walt Longmire series by author Craig Johnson. How good are they? I've read three in the last week.
First, this 60" flat screen tv/monitor.
Next, this almost eight foot wide interactive whiteboard. We'll be able to draw on this whiteboard and save our work to a computer.
Last but not least is the ceiling mounted projector (it's the black box in the upper right hand corner) capable of projecting an 10 foot wide image onto the wall opposite. Nobody will ever be able to say they can't read the numbers on a presentation ever again.
I am very proud to be a part of the renovations but I have to tell you it is wearing me out. I got home very late last night, and by the time I had eaten my dinner it was 9 PM. I've been spending my downtime sacked out on the couch with a few good books, notably the Walt Longmire series by author Craig Johnson. How good are they? I've read three in the last week.
Friday, September 28, 2012
Black Box Update
I found Millie napping on the Black Box quilt. I've tried to keep it someplace where she can't get on it, but obviously I failed.
I have been working on the quilt. I didn't like part of what I did the last time I worked on it, so I took that out. I realized I put the left side of the box and rays together differently than the way I put the right side together. So I've taken it apart and will get it back together the "correct" way.
It isn't that I've been avoiding this quilt, it's just that I've been named project manager of the renovation of our primary conference room at work. This means I've been on the phone with the contractor, electrician, designers, and technical folks for hours each day. It means I've been the go-between between the CEO and CFO and everybody else on the outside. I've been shopping for conference room chairs, reviewing rug samples, soothing ruffled feathers and getting to know some really wonderful painters, plasterers, and carpenters. It means I've got to work early to meet workers, and left late (after getting my own work done). I even spent a few hours at the office last weekend while a two foot wide by ten foot long trench was jack-hammered out of the concrete so we could run electrical, network and telephone lines under the floor so they could come up through the bottom of the as-yet-to-be-selected ultra-mega-cool conference room table.
Everything that -was- in the room is going. The wallpaper was stripped, and the condition of the wallboard underneath was not good. The walls needed two days of prep work before the custom designed, custom printed wallpaper could be hung. Tomorrow the very last of the wallpaper will be hung, and the "jewelry" will be installed. What "jewelry?" A 60" flat panel TV, a ceiling mounted projector, a new speaker system, and an almost four foot by eight foot interactive whiteboard. Running these goodies will be not one, but two computers. We're getting a 3D version of our corporate logo installed on one long wall (they call it "branding") along with some large images of the products we manufacture. (I've had to oversee the choice of those photos too.)
So not only have I been getting home late, but I've been pretty well zonked. That and the fact that my son is traveling on the West Coast (two weeks ago he was in Mexico, next week he'll be in Yosemite) and has been calling me late at night to talk have all contributed to make me spend my evenings sacked out on the couch with a book instead of in the sewing room making magic.
Fortunately the "heavy lifting" part of the project is complete, and I'll be able to get back to sewing soon.
I can't wait.
I have been working on the quilt. I didn't like part of what I did the last time I worked on it, so I took that out. I realized I put the left side of the box and rays together differently than the way I put the right side together. So I've taken it apart and will get it back together the "correct" way.
It isn't that I've been avoiding this quilt, it's just that I've been named project manager of the renovation of our primary conference room at work. This means I've been on the phone with the contractor, electrician, designers, and technical folks for hours each day. It means I've been the go-between between the CEO and CFO and everybody else on the outside. I've been shopping for conference room chairs, reviewing rug samples, soothing ruffled feathers and getting to know some really wonderful painters, plasterers, and carpenters. It means I've got to work early to meet workers, and left late (after getting my own work done). I even spent a few hours at the office last weekend while a two foot wide by ten foot long trench was jack-hammered out of the concrete so we could run electrical, network and telephone lines under the floor so they could come up through the bottom of the as-yet-to-be-selected ultra-mega-cool conference room table.
Everything that -was- in the room is going. The wallpaper was stripped, and the condition of the wallboard underneath was not good. The walls needed two days of prep work before the custom designed, custom printed wallpaper could be hung. Tomorrow the very last of the wallpaper will be hung, and the "jewelry" will be installed. What "jewelry?" A 60" flat panel TV, a ceiling mounted projector, a new speaker system, and an almost four foot by eight foot interactive whiteboard. Running these goodies will be not one, but two computers. We're getting a 3D version of our corporate logo installed on one long wall (they call it "branding") along with some large images of the products we manufacture. (I've had to oversee the choice of those photos too.)
So not only have I been getting home late, but I've been pretty well zonked. That and the fact that my son is traveling on the West Coast (two weeks ago he was in Mexico, next week he'll be in Yosemite) and has been calling me late at night to talk have all contributed to make me spend my evenings sacked out on the couch with a book instead of in the sewing room making magic.
Fortunately the "heavy lifting" part of the project is complete, and I'll be able to get back to sewing soon.
I can't wait.
Tuesday, July 17, 2012
Work Office Re-do
They rearranged the cube farm at work. Actually, we got to design our workspaces (within certain limitations, of course). Everybody knows where to find me!
Actually that's only half my workspace. The other half is here:
My coworkers are lobbying to get to see a new quilt every so often. We'll see.
Actually that's only half my workspace. The other half is here:
My coworkers are lobbying to get to see a new quilt every so often. We'll see.
Tuesday, January 12, 2010
A Fine Ending
Thursday, April 16, 2009
Something Completely Different
Subscribe to:
Posts (Atom)

















