Page 1

Monday, February 15, 2010

Work, work, work

Tying a quilt while watching the Olympics on television requires having a few tools handy. Note the tv remote control. The portable phone is nearby, because getting down on the floor is a lot easier than getting up at my age.

I've got about 2/3 of the quilt tied.

3 comments:

  1. I can't wait to see the completed quilt.

    ReplyDelete
  2. Woo Hoo! Almost done! I spent the afternoon trying to snow-blow the driveway (AGAIN!!!!!!).

    ReplyDelete

Thank you for taking the time to share your thoughts with me.